Bitcoin Private Relaunch — High-Level Plan

This page summarizes the public workstreams for restoring Bitcoin Private on a modern Zebra-based stack with a cleaned transparent UTXO set. Detail will grow over time; forensic internals and private operational notes are intentionally omitted. Progress on individual tasks is published live on the Progress page.

How the workstreams fit together

The relaunch is not a single repository. Clean genesis balances (W1) feed the new Rust node (W9). Holders then verify (W2) and spend (W3 / W4). Docs and the project website (W7 / W8) publish the story. Governance, stakeholder outreach and DEX work (W5 / W6 / W10) run alongside without blocking a minimum viable relaunch. The node (W9) moves through private milestones first — a chain that can be born, then a private development network, then a public testnet, then a full rehearsal — before any Mainnet genesis.

System picture — interdependence (simplified for public view)

W7 Docs + history
W8 Project website (this site)
▼ informs / publishes ▼
W6 Stakeholders / community
W2 Balance query (complete)
W5 Governance research
▼
W1 — Final UTXO + Genesis Allocations Clean holder set · redemption fund · contingency · treasury · genesis total — signed off
▼ clean UTXO + genesis total ▼
W9 — Rust Node + Chain Parameters Zebra 7 base · network identity · Equihash 192,7 · emission · genesis import · testnet
▼ devnet · testnet · RPC · params ▼
W3 Wallets (Electrum-BTCP + desktop)
W4 Electrum server / explorer
W10 DEX interoperability

Critical path: W1 → W9 → W2 + W3/W4 → W7/W8.
W5, W6, and W10 run in parallel and must not block genesis correctness.

Critical path

W1 (the final clean UTXO set and genesis allocations, now signed off) feeds the new node and its chain parameters (W9). Holders can already check their balances (W2, complete). W9 brings up a private development network and then a public testnet, which unlock the wallets (W3) and the Electrum server and explorer (W4). Documentation and the project website (W7 / W8) carry the public narrative. Governance research, stakeholder outreach and DEX interoperability (W5 / W6 / W10) run in parallel without blocking genesis correctness. No Mainnet node build will be published until Bitcoin Private’s own genesis is in place.

Active & Planned Workstreams

W1

Final UTXO + Genesis

Signed off
  • Genesis-ready transparent UTXO set produced after surgical removal of illicit proceeds and Great Coinburn candidates; signed off on 1 November 2026.
  • Genesis allocations defined: treasury, redemption fund for defunct exchanges, and contingency reserve (see the Guiding Principles).
  • Handed to the node workstream (W9) for the genesis import. The file itself stays private until genesis.
W9

Rust Node + Parameters

In Progress
  • Rust full node forked from the Zcash Foundation’s Zebra, now on Zebra 7, carrying Bitcoin Private’s identity (b1 / bx addresses), Equihash 192,7 and its own consensus rules.
  • Core chain parameters have been decided, within the 21M total supply; they will be published with the public testnet.
  • In progress: the new difficulty rules are being built into the node in stages (four of six stages complete); the inherited Zcash development-fund payout has been removed.
  • Next: importing the clean genesis set, the emission and funding code, then a private development network and a public testnet, which unblock the wallet, query tool and Electrum surfaces.
W2

Online Balance Query

Complete
  • Holders can check their balances on this site (the Balance Query page).
  • The balance figures follow the data notes shown on the Balance Query page itself.
W3

Wallets

In Progress
  • Electrum-BTCP: an updated Electrum-BTCP client for legacy holders, rebuilt on the current Electrum release. Holders will be able to restore their old wallets; original 2018 wallet files are never modified (the client works on a copy). In active development: the fork, its safety harness and Bitcoin Private’s network identity are done; block-header verification is next.
  • Desktop wallet: a full Bitcoin Private desktop wallet for all three desktop platforms is planned, based on the Zingo wallet.
  • DEX work is tracked separately as W10.
W4

Electrum Server / Explorer

Planned
  • An Electrum-compatible server and explorer endpoints so the Electrum-BTCP client and third-party wallets can connect.
  • Follows the public testnet from W9.
W5

Governance Exploration

Research
  • Study whether holder governance can coexist with PoW (transparent signed ballots; optional later enhancements).
  • Does not block relaunch consensus work.
W6

Stakeholder Outreach

Parallel
  • Organize community, documentation, and email channels for exchange conversations and outreach.
  • Historical community archives have already informed exchange disposition policy; a structured outreach DB is still to be built.
W7

Documentation

Ongoing
  • Public-facing history, node/wallet technical docs, and relaunch communications as products stabilize.
W8

Project Website

Live
  • btcp.cash is the relaunch project’s website: principles, timeline, roadmap, live progress and the balance query.
  • The original Bitcoin Private domain has not been returned by its former custodians, so this site is the project’s public home (see the timeline).
W10

DEX Interoperability

Future
  • Path toward non-custodial swap venues (THORChain/THORSwap-class) so holders trade without relying on defunct CEXs.
  • Starts after node (W9), wallet (W3), and node surface (W4) exist.

What this means for holders & exchanges

The Balance Query page shows each address’s balance in the pre-sanitization set at block height 680,000 and its interim post-sanitization balance. The clean set was signed off on 1 November 2026; balances stay interim until launch, because a late confirmation from an operational counterparty could still change them. Neither figure is a balance on the relaunched chain, which does not exist yet.

For legacy holders: the Electrum-BTCP client being rebuilt will let you restore your old wallet. It never modifies your original 2018 wallet files; it works on a copy, so your originals stay usable.

Exchanges and integrators can use this roadmap to track readiness: clean UTXO (W1) → holder balance check (W2, live) → node + chain parameters (W9) → public testnet → wallets and Electrum server (W3/W4).

For major policy choices behind the cleaned UTXO (including how operational vs defunct exchanges are treated), see Sanitized UTXO Guiding Principles. For a high-level chronology, see Overall BTCP Timeline.